How we work

A transparent process from first contact to final handover

From the initial consultation and site survey to preparation, installation and handover, every stage is planned clearly and completed with care across Birmingham and the West Midlands.

Coordinated trades

Agree the handovers room by room

We identify which rooms are ready, what other trades still need to do and who supplies each finish. One Complete Finish contact coordinates the subcontractors for the agreed work. Access, protection, drying time and the final checks are built into the sequence.

See the finishing packages · Send your room list

01
Masking and surface preparation before decoration

Stage 1

Initial consultation

We establish what needs to be completed, the expected finish, the property type and the intended programme.

  • Telephone or online enquiry
  • Photographs and basic measurements
  • Rooms, access and preferred timing
02
Exterior facade before stone cladding

Stage 2

Site survey and quotation

We inspect the condition of surfaces, access, dimensions and preparation requirements before setting out the scope.

  • Defined labour scope
  • Preparation identified clearly
  • Materials listed separately
03
Feature slat panel and wall finishing in progress

Stage 3

Design and finish planning

Colours, materials, layouts and key details are agreed before installation begins.

  • Samples or visual references
  • Tile and stone setting-out
  • Room-by-room finish decisions
04
Waterproofing detail at the wall-to-floor junction

Stage 4

Protection and preparation

The working area is protected and every substrate is prepared according to the selected finish.

  • Floors and fittings protected
  • Repairs and levelling completed
  • Primers or tanking applied where required
05
Waterproofed shower area during tile installation

Stage 5

Installation and finishing

The agreed system is installed carefully, with regular checks as the work progresses.

  • Methodical installation
  • Clean edges and junctions
  • Progress communication
06
Completed kitchen and dining-area finish

Stage 6

Inspection and handover

We complete a final quality inspection, clean the working area and hand over the completed project.

  • Final review
  • Care information where relevant
  • Two-year workmanship warranty

Real project photographs

Preparation and installation in progress

These photographs document surface preparation, protection, waterproofing, setting-out, levelling, stone installation, tiling and painting before final handover.