
Protection before the visible finish
Waterproofing & tanking
Wet-area preparation using suitable tanking systems, sealed junctions and careful detailing before tiling.
Complete service
Preparation and finishing included in one defined scope.
Wet-area preparation using suitable tanking systems, sealed junctions and careful detailing before tiling.
Before work begins, the quotation will identify the preparation included, the agreed finish and any items that require separate specialist attention.
What is included
A complete, professional workflow
Prepare surfaces and reinforce critical junctions
Install the specified membrane or tanking system
Seal corners, penetrations and board joints
Observe required curing or drying times
Inspect protection before tiling begins
Finish options
Materials and finishes
- Liquid-applied tanking systems
- Sheet membranes where specified
- Reinforcing tape and preformed corners
- Compatible primers and sealing components
- Water-resistant boards where included in the scope
Suitable applications
Where this service can be used
- Shower enclosures
- Bath surrounds
- Wet rooms
- Bathroom floors and vulnerable junctions
- Other moisture-sensitive areas identified during survey
Hidden work made visible
Waterproofing and wet-area preparation
These progress photographs show tanking, falls, drainage details, tile setting-out and the preparation behind a durable finished bathroom.
Two-year workmanship warranty
Work completed with accountability after handover.
All workmanship completed by Complete Finish is covered for two years, subject to the written warranty terms.
